QR-tagged rack structure with RAG risk-scored audit zones

››› Audit Scope

Three layers of structural intelligence

Building Structure Audits

Chartered-engineer-led periodic reporting on the facility's primary and secondary structure.

Rack Structure Audits

EN 15635-aligned inspection and certification for every rack row and bay.

MHE Intelligence

Incident logging plus safety, productivity, and utilisation dashboards for material handling equipment.

››› Methodology

The 8-step digital-twin audit workflow

1

Site Mapping

CAD data and warehouse geometry are captured.

2

Digital Twin Build

Rack rows, bay IDs, and uprights are digitized into the twin.

3

QR Tagging

Every upright gets a unique QR code, linking the physical asset to its digital ID.

4

EN 15635 Audit & Risk Classification

Engineer-led inspection with RAG scoring — Red (immediate action), Amber (within 4 weeks), Green (monitor).

5

Rack Structure Integrity Tests

Upright alignment, beam deflection, member distortion profiling, ultrasonic thickness, and bolt tightness checks.

6

BOQ & Repair Plan

An OEM-validated bill of quantities and repair plan is auto-generated.

7

Closure Tracking

Repairs are tracked digitally through to completion, with verified evidence.

8

Certification

A stability certificate is issued post-rectification, with a full digital audit trail.

››› The Shift

Annual PDF vs. continuous monitoring

What you get todayWhat you actually need
Static PDF, filed and forgottenLive digital twin, always current
Once-a-year visibilityContinuous rack-health monitoring
Manual or no follow-upWorkflow-based repair closure with evidence
No trend dataDamage recurrence analytics & hot-zone identification
No bay-level trackingBay-level QR identity per upright
Certification expires silentlyTraceable lifecycle record, audit-ready always

››› Programme Tiers

Choose the level of assurance your facility needs

Essential

Get compliant and get a baseline

  • Digital twin creation
  • EN 15635 inspections
  • QR integration
  • RAG categorization
  • Vertical alignment & beam deflection tests
  • Standardized reports + BOQ
  • 3-month platform access
  • Preventive maintenance planning
Request a Quote

Premium

Engineering-grade structural analysis

  • Everything in Performance
  • Ultrasonic thickness measurement
  • FEM (finite element) analysis
  • Safe Working Load (SWL) calculations
  • Utilisation & deflection ratios
Request a Quote

››› Business Value

The economics of continuous monitoring

Approximate figures for reference, based on a ~1 lakh sq. ft. warehouse — verify current figures with our team before treating them as a quote.

Annual-only modelContinuous programme
Inspection costapprox. ₹1.5–4Lapprox. ₹5–10L all-in
Reactive / prevented repairsapprox. ₹6–25L reactiveapprox. ₹0.5–3L prevented
Downtime per incidentapprox. ₹5–15L/daynear-zero downtime
Legal exposureunlimitedprotected legal defence
Frames replaced / yearapprox. 15–25approx. 5–10

Typical reported ROI: approx. 3×–8×, with damage frequency dropping from roughly 5% to 1–2%.

Turn your next audit into a living safety record

Start with a site walk and a scoping conversation — we'll recommend the right programme tier.